Design/Build Renovate Bldgs 1357, 1363, 1365 & 1367, EOD Lyons Den/TEU 2, Fort Pickett, VA - Phase 1

Contract No: W91236-10-D-0089 D.O. 0003
(Corps of Engineers)
Contract Amount: $1,222,565.70
Brief Description: This project consisted of the design and renovation of four (4) buildings at the EOD training compound. Work included demolition, asbestos & lead abatement, new windows and new finishes throughout. Also included complete bathroom and shower facilities upgrades, new kitchen, upgraded electrical service, new HVAC systems and new fire protection systems.

Design/Build Renovate Bldgs 1354, 1355 and 1386, EOD Lyons Den/TEU 2, Fort Pickett, VA - Phase 2

Contract No: W91236-10-D-0089 D.O. 0004
(Corps of Engineers)
Contract Amount: $1,335,524.44
Brief Description: This project consisted of the design and renovation of four (4) buildings at the EOD training compound. Work included demolition, asbestos & lead abatement, new windows and new finishes throughout. Also included complete bathroom and shower facilities upgrades, upgraded electrical service, new HVAC systems and new fire protection systems.

Shoreline Restabilization, Colonial National Historic Park, Yorktown, VA

Contract No: W91236-13-C-0039
(Corps of Engineers)
Contract Amount: $797,752.00
Brief Description: Project included the rehabilitation and installation of rock revetments, rock spurs, gap sills, pocket beaches and shoreattached breakwaters as a means of shoreline defense along the bank of the York River.

Design/Build Vehicle Maintenance Facility, Ft A.P.Hill, VA

Contract No: W91236-10-D-0089 D.O. 0001
(Corps of Engineers)
Contract Amount: $620,916.00
Brief Description: Project required the design and contruction of a 3,600sf Pre-Engineered metal building to be used for the purpose of heavy equipment maintenance. Work included the installation of high bay electrically operated doors, office space, ventilation, electrical and extensive site work.

Magazine Roof Replacement (Historical) Fort Norfolk

Contract No: W91236-13-C-0070
(Corps of Engineers)
Contract Amount: $227,552.00
Brief Description: Work included lead and asbestos abatement, demolition, replacement of deteriorated wood, installation of synthetic slate shingles and painting, all while maintaining access for visitors to the historically significant facility.

Replace Roof, Building 206, Naval Security Activity, Mechanicsburg, PA

Contract No: N40085-09-C-0131 (NAVFAC)
Contract Amount: $1,617,000.00
Brief Description: Project consisted of the removal and replacement of gravel surfaced multi-ply BUR systems and associated built-up roof and EPDM flashing, as well as abating asbestos containing fascia and wall cladding from monitor walls and other various locations. Also included the installation of EIFS on monitor walls, metal fascias, exterior ladder assemblies, wood blocking, wood plank decking, new rooftop lighting fixtures and poles, roof drains and the removal and reinstallation of HVAC units.